Problem Solved

We have all seen this on site

Photo 1

The electrician has done the first fix and the plasterer has pushed the wires in and plastered over the lot.

To “get a good finish on the wall”

This can be prevented

We can all save time and money and get a better job done at the same time.

Photo 2

The is the typical starting point. The sparky leaves spare wire to allow for any problems at the second fix stage.

Photo 3

But if they were to use the ElecProTect™ system and fit a KUVA™ as shown here, the wires are protected.

Photo 4

The back boxes are fully protected from dust and plaster. Knowing this the electrician can prep the wires for the second fix now and save time later.

Photo 5

With the back boxes protected the plasterer's job is so much easier and they can get a great finish.

Photo 6

The plaster is easily removed when the electrician is ready for the second fix.

Photo 7

The KUVA™ is taken off and with a quick wipe is ready for use again these are reusable.

Photo 8

You have a perfect platering job and the back boxes so clean, the second fix can be done in your best suit.

We all save time and money.